The third national electric wire electric cable profession skills competition the third national ele
Click:2779Time:2015-08-26 11:00:02
The game scene, players seriously installed, adjust the parameters, debugging equipment, the final production of finished products, monitoring product quality, and this series of operations is to test the players' skills and quality control, etc..
Small extrusion match point, fine such as noodles of the wire in the equipment of traction slowly into the extruder, extrusion machine "exit", the original "naked" wire has been covered on the layer of black insulating layer. In the whole process of extrusion, contestants through the display equipment observed in insulating layer is wrapped, and any instructions issued to fine tune. Due to the equipment running speed and extrusion time constant play a great test of contestants proficiency and operational stability.
It is reported that the extrusion ratio is quality control and production efficiency, to get the wires, the first to visual wire thickness, corresponding to the extrusion die, the manual to complete the insulation layer of the wall thickness of the initial adjustment; secondly, according to the device of measuring diameter instrument real-time data feedback, at any time to adjust insulation layer thickness, ensures that the insulating wire round shape, wall thickness is uniform.
The national vocational skills competition held not only to help wire and cable companies to develop advanced skills, but also conducive to promoting the healthy and sustainable development of wire and cable industry.